[IPS Logo]
[Integrated Power Systems Logo]








System Deinstallation

Most system upgrades or replacements require the removal of an old system. Integrated Power Systems routinely does this without affecting system load. The old system is taken off line, packaged and transported per EPA and DOT guidelines to the appropriate recycling facilities. Copies of the recycling manifest are then forwarded to the customer.

Back
System Engineering
Power Room Design
System Delivery
Temporary Power Systems
System Installation
System Grounding
System Start Up
System Acceptance & Performance Testing
Preventative Maintenance
Facilities Management & Contractor Coordination
Copyright © 2000 Integrated Power Systems Inc.
All Rights Reserved
Contact Us
Quote Employment Products Services Contact Us Home